Jim Faust, Thesis Supervisor M Kevin Parfitt, Thesis Supervisor David R Riley II, Thesis Honors Advisor
Keywords:
natatorium construction recreation center structural system mechanical system pearland houston texas welded connection bolted connection delivery method public project